Yes on X: Let our waterfront thrive
Sausalito votes · November 3, 2026

Fix up the Marinship. Keep Sausalito's character.

Measure X lets longtime waterfront businesses repair, reinvest and sell what they make. It approves no new buildings, and every future project still needs public review.

What it does, and doesn't do Your questions, answered

What Measure X does, and what it doesn't

In plain terms, for anyone worried about big development.

It does

Let longtime businesses fix and replace aging buildings, docks and workshops.
Let makers sell what they make, where they make it. Today a coffee roaster can't sell a cup of coffee to a worker, and a bakery can't sell a baguette to a neighbor.
Grow the tax base that pays for flood protection, roads and storm drains.
Open the door to public docks, kayak launches and cafés by the water.
Put waterfront proposals through the same public process as the rest of Sausalito.

It does not

Approve a single new building. Every project still has to apply, and can be changed or denied.
Rezone any land for housing.
Allow anything taller than 47 feet, about the height of the new building at 101 Caledonia. In the Waterfront zone the limit stays 32 feet, except for certain marine uses with a use permit.
Change the historic downtown.
Take away public hearings, environmental review or your right to appeal.

"Measure X is not a complete plan. It is a first step." Steve Woodside, Mayor of Sausalito

Who Measure X is for

Local businesses that have kept the Marinship working for decades, and the 1985 rules that hold them back.

Ken Pedersen and his son KC at Clipper Yacht Harbor

Clipper Yacht Harbor

Family-run since 1947.
Blocked: rebuilding, growing and protecting its site from rising seas.
“Outdated laws make it hard to adapt. I want to hand our business down to a fourth generation. Without Measure X, that might not be possible.”
KC Pedersen, third-generation owner
Zach Weinstein, owner of LLEA Blue, on his sewing floor in the Marinship

LLEA BLUE

Designs and makes clothing in the Marinship.
Blocked: selling its clothing where it’s made.
“My family has made clothing in Sausalito since 1989. We’ve just never been allowed to sell it here. Measure X is the first real chance in 40 years to change that.”
Zach Weinstein, owner
Robin Petravic and Catherine Bailey, co-owners of Heath Ceramics, in the mold room of their Sausalito factory

Heath Ceramics

Made in Sausalito since 1948.
Blocked: covering its outdoor yard to protect workers and the environment.
“We’ve been in this building for 70 years, and we’re bursting at the seams. 40-year-old laws make it impossible to make our space more usable. Measure X is our best bet to stay in Sausalito.”
Robin Petravic, Catherine Bailey, co-owners of Heath Ceramics
We've been here before

We've studied the Marinship for 16 years. It's time to take the first step.

We already know what Sausalitans want: a working waterfront, artists and makers, public access, flood protection and better infrastructure. We don't need more years of studies to learn it again. Measure X moves change from impossible to merely very hard.

“We need to act as if the Marinship is drowning. Because it is.”
Steve Woodside, Mayor of Sausalito
  1. 1985Voters pass Ordinance 1022. It requires a citywide vote for any change in use that increases commercial activity.
  2. 2008The City forms a 17-member Waterfront and Marinship Committee.
  3. 2010Its 72-page plan for a better working waterfront is shelved. It warned of 16 inches of sea-level rise by 2050.
  4. 2012–16More studies. More flooding.
  5. 2026Gate 5 Road floods so badly the City declares a state of emergency. The fixes are 15 years overdue.
  6. Nov 3Measure X: the first real step in decades. It approves no construction. Every proposal still gets public and environmental review.

Doing nothing has a cost, and residents pay it

Vacant lots, rusting RV storage, streets that flood at high tide. If Measure X fails, none of that changes. Buildings keep aging, sea-level rise gets more expensive to address, and businesses we love take their investment elsewhere.

Without a stronger tax base, the pressure for higher taxes on residents only grows. As Councilmember Ian Sobieski puts it: "You are paying higher taxes to subsidize decay."

It has already happened. Heath Ceramics asked the City for a new roof so more of its work could move indoors. As the Marin IJ editorial board recounts, the owners were told the change would need a citywide ballot measure, so Heath built what it needed in San Francisco instead.

"Sausalito can no longer afford inaction."
Marin Independent Journal editorial board, endorsing Measure X, September 30, 2026
"That's not preservation, that's willful disregard."
The same editorial, on the rusty buildings and vehicles that remain as businesses leave or struggle

Environmental groups, the working waterfront and the Marin IJ all say Yes

Marin Independent Journal
Sierra Club endorsed
Sausalito Sustainable Waterfront Association
Sausalito Chamber of Commerce
Greenbelt Alliance
Heath Ceramics
"Measure X is the first time I have been able to vote on anything related to the Marinship in the 37 years I have lived in Sausalito."
Ron Albert, Mayor and Councilmember 2002–06, Planning Commission Chairman 1997–2002
"I am a Sausalito resident and would have loved to expand our business into Sausalito, but couldn’t find the space and had to go elsewhere. I believe AIM [Measure X] would encourage creation of space for businesses like mine to thrive in Sausalito."
Andrea Delaroque, Owner of Maison Nico, French-inspired market and café

See the community leaders who endorse Measure X.

Also endorsed by Heath Ceramics, Clipper Yacht Harbor, Schoonmaker Point Marina, Blue Water Yacht Harbor, Marina Plaza Harbor, Modern Sailing, H&M Marine, Hood Sailmakers, Fish, Fjord, 2200 Studios, Sausalito Liquor Company, Mauma, Tellason, Township and more. See the full list.

Worried about big development? Here are straight answers.

These are the concerns we hear most from neighbors, and what Measure X actually says. Don't take our word for it: read the initiative.

The worry
"Will I lose my vote? Will three Council members decide everything?"
The answer

You still have a say on every project.

"Voter control" has produced zero votes: no proposal from a business or property owner has gone to Sausalito voters under Ordinance 1022 since it passed in 1985, because a citywide election costs too much. Under Measure X, every project gets environmental review, Planning Commission review and public hearings, like the rest of town. And voters keep the last word: the City's outside legal review confirms that the Council's zoning actions "would be subject to referendum."

The worry
"Will big buildings go up along the waterfront?"
The answer

Nothing taller than 47 feet in the industrial zone. Right on the water, the limit stays 32.

47 feet is about the height of the new building replacing the old theatre at 101 Caledonia. In the Waterfront zone only certain marine uses, with a use permit, may go above 32.

Measure X approves no building; every proposal can still be changed or denied.

The worry
"Will artists and makers be priced out?"
The answer

What prices them out today is a shortage of space.

Marinship industrial rents already top $3 a square foot, against about $0.75 in Alameda. Measure X lets new workspace be built and lets makers sell what they make where they make it. Its text states: "No new or additional use may displace the uses at ICB Building or shipways at the historic Arques Shipyard."

More questions residents ask

"Does Measure X reach beyond the Marinship?"

Yes, because it cleans up old, ambiguous law that was never meant to apply to all of Sausalito's commercial districts.

Ordinance 1022 was passed in 1985 with the Marinship in mind, but its wording inadvertently swept in all of Sausalito’s commercial districts. City Attorneys have concluded it applies to all of them. The City Council tried to fix it, but because voters passed it in 1985, it couldn’t be changed without another citywide vote. Until then, any zoning change in these areas, however small, needs its own citywide vote. That’s so costly and complex that in 40 years, no business or property owner has ever done it.

The result? In practice, a default “no.” Businesses struggle or invest elsewhere, and residents never get to weigh in on new ideas we may actually want, because those ideas never surface. That’s why Measure X is on the ballot.

Outside the Marinship, Measure X does not change current zoning, height limits or building-size rules. It simply returns these decisions to the normal local process of public hearings, open meetings and environmental review.

"What kinds of businesses would it allow?"

In the Industrial and Waterfront zones it allows a broader mix of complementary businesses, including arts, maker spaces, manufacturing, child care facilities, coffee shops and cafes. Businesses that make products in the Marinship would be able to use up to 40% of their workspace to sell what they make directly to the public.

"Doesn't it authorize millions of square feet of new construction?"

Measure X authorizes no construction. It raises the ceiling on what a property owner may ask for. No entitlement is created: every proposal still goes through the City's review and can be modified or denied. The City's outside legal review concluded that "actual development is likely to occur incrementally over time." 

"What about traffic and waterfront views?"

Measure X itself approves no buildings. Any future project still goes through the same local review used everywhere else in Sausalito: environmental review, public hearings, and Planning Commission design review, which weighs a proposal’s impact on traffic, views, character, and scale. Decisions can be appealed to the City Council. And the City’s outside legal review confirms this: “Design review and environmental review requirements would continue to apply.”

The 32-foot height limit on the waterfront stays the same as it is today. In the industrial zone, which is mostly down below Bridgeway, the limit is 47 feet, about the height of the building that replaced the Caledonia Street theater. Many existing Marinship buildings are already that tall or taller.

"Isn't the Marinship on bay fill that floods?"

Yes, and it's already built on and already flooding. Leaving the rules alone protects nothing. Any new building must first study and mitigate flooding and soil conditions in environmental review. Measure X is how the waterfront starts to generate the reinvestment and revenue needed for seawalls, drainage and sea-level rise, which is why the Sierra Club and Greenbelt Alliance endorse it.

"Can't Marinship businesses already sell to the public?"

Generally, no. City staff report that retail and restaurant uses are "not permitted under existing zoning" in the Marinship. That's why Diameter Plants couldn't move there. And that's why many makers in the Marinship cannot sell what they make.

"Why is the initiative 266 pages long?"

The changes to Ordinance 1022 run about 8 pages. Election law requires printing every code section that is touched in full, and 128 of the pages are the retired Marinship Specific Plan with an X over each page.

"Why not vote No and wait for a better plan?"

We had a better plan. In 2010, a 17-member City committee delivered a 72-page vision for the waterfront after two years of public workshops, and it was shelved. The Marin IJ editorial board heard the same pitch and endorsed Measure X anyway: "It is a Sausalito tradition to stop proposals and promise a better plan in the future. But no significant plan has ever been approved and little has really changed."

"Isn't the Marinship already the city's economic engine?"

Across more than 200 acres, the Marinship generates about $10,000 an acre in City tax revenue. Downtown Bridgeway generates roughly $70,000 an acre. That gap is money not available for roads, storm drains and sea-level rise.

In their own words

Hear it from the Marinship

Local businesses explain what Measure X would mean for them. Tap a video to play it.

Hog Heaven Sportsfishing
Heath Ceramics
Marinship Studios

Why the Marinship is stuck, by the numbers

"Alive and growing"? The Marin IJ editorial board describes the Marinship as "plagued by vacant offices, decaying structures, rotting vehicles and tidal flooding that promises to get worse."

$10K vs. $70K
City tax revenue per acre: the Marinship compared with downtown
400 sq ft
The most building allowed today on 1,000 square feet of Industrial-zone land
$3+
Industrial rent per square foot in the Marinship, against about $0.75 in Alameda
0 votes
Marinship business/property owner proposals put to voters since 1985. The rules made it too costly to try

Vote Yes on Measure X by November 3

Fix what's broken. Protect what we love. Talk to a neighbor, put up a sign, or add your name.

Count me in Donate Add your endorsement